Blog Archive

INCINERATEUR COMBUSTION DESTRUCTION OF MEDICAL WASTE PYROLYTIC AND LABORATORY,incinerator medical waste manufacturer

WASTE INCINERATOR

  –          150 KG/HR –          Compliant with EU rules, Directive 2000/76/EC –          Fuel type: Diesel –          Easy management and maintenance –          Temperatures: 850 deg C for municipal waste 1000 deg C for medical waste 1100 deg C for dangerous waste containing halogenated …

Medical Waste Incinerator BID

1. Technical specifications; I. Size of the Incinerator 4,410W x 3,037L x 4,836H mm II. Capacity of the Incinerator Medical waste 50 kg/hr. batch feeding (low degree caloric value: 4,000 5,000kcal/kg) III. Utility Utility condition for the incineration equipment operating is the …

Medical Waste Incinerators

Incinerator but the size of chamber > 2000 x >1200 mm. Prepare for burn LIQUID Waste +/- 20 liter/hr. Fueled by Heavy OIL Burner.waste disposal incinerator, capable of handling both wet and dry garbage.. Which include house hold wastes and dry leaves. …

Medical Waste treatment unit

Medical Waste treatment unit The medical waste treatment unit shall be environmentally-friendly, and have a capacity of about 200-300kg per batch , to enable treatment of medical waste generated in a 160-bed hospital The equipment should be self-steam generating if steam is …

incinerator plant specification

1)  Electricity Supply: (a) Mains Supply: (i)  Single Phase supply; 220 – 240V, 50Hz (ii) Three Phase supply; 380 – 415V, 50Hz (iii) The power supply outlet (sockets) for single phase supply system in the hospital is three pins and conforms to …

lab biological waste incineration

1- There are more than 4000 Cubic Meter sludge are packed in Plastic Bags & stored more than 10 years 2- Cleaning and treated 2500 Cubic Meters inside the Oil Tank. – the waste is biological and coming from lab, can be …

medical was incinerators Department of Health

hospital waste management team at a tertiary care hospital ,1250 beeded hsopital . our daily waste generated from all sources is 0.55kg/bed/day =685kg/day we need an incinerator of 150kg/hour loading capacity. plz reply with , buying,installation, running and maintenance cost. incinerators, specifically, …