a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner

The incinerator should be a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner. It 
should employ a temperature based logic control system to provide optimum control of the operating conditions and incorporate a high capacity 
thermal oxidizing secondary chamber. It should be designed to retain the exhaust gases, for at least 2 seconds to ensure the unit’s effective 
destruction of the combustion products.  
i. Waste type Health care waste  
ii. Waste density 125 to 350Kg/M3  
iii.. Waste Calorific Value 4000 KCAL/Kg  
iv. Moisture content 10-25%  
v.  Estimated ash  residue 5-10%  
vi.  Nominal capacity  50Kg/hour batch load  
vii.  Secondary chamber 2 seconds @ 850°C  
The primary combustion chamber is the main structure of the incinerator, fabricated from mild steel plate and stiffened with rolled steel 
sections. It is carried from the floor level on a substantial steel support frame. Internally the shell is lined with calcium silicate 
insulation and a hot face combination of super duty brickwork or high strength castable.  
The primary combustion chamber must ensure minimum exit temperature is not less than 850°C.  
One Manual Load Incinerator comprising:  
•         Manual Loading door  
•         Horizontal solid hearth, refractory lined primary combustion chamber. Approximate dimensions 800 mm diameters x 2100mm long  
•         Full sized bulk load/ash removal door  
•         1 off diesel-fired ignition burner — temperature controlled  
•         1 off combustion air supply fan and distribution system, automatic control  
•         High capacity secondary combustion chamber with residence time not less than 2 seconds @ >850°C  
•         1 off diesel-fired afterburner — temperature controlled  
•         Control panel — automatic operation  
ð      Temperature indication primary and secondary chambers 0-1200°C   
ð      Refractory lined flanged chimney to a height of 10M above ground level  
50kg/hour at a nominal calorific value of 4,000 kcal/kg and an average bulk density of I20kg/ M3 for general waste and l60kg/ M3 for health 
care waste.
(1) Moi Voi District  Hospital
(2) Makindu District  Hospital
(3) Gabartonjo  Hospital in Baringo County
(4) Isiolo District  Hospital
(5) Kigumo  Hospital in Murang’a County