supply and installation of an incinerator furnace

the supply and installation of an incinerator furnace with a capacity of 300 kg of animal carcasses in a normal working day 
5:00 , with burner and all the necessary accessories for its proper functioning .
This kiln incinerator must be stationary on a concrete foundation .
It will also be provided :
the supply and electrical connection between the incinerator furnace and the control cabinet
the supply and installation of the fireplace,
the supply and fitting of the burner,
the supply and installation of all the refractory masonry,
the heating tools ( shovels, picks, scrapers , etc. ….. ) .
the fuel tank with a capacity of 3000 liters ,
the daily capacity of 300 liters tank
the supply of 3300 liters of diesel , after testing,
the connection between the main fuel tank , daily tank and furnace ,
training of operating and maintenance personnel ,
commissioning and comprehensive testing of all equipment ,
the supply water in the incinerator vessel by pipe diameter 26 /34.