HICLOVER TS300(PLC) Incinerator

Incinerator Items/Model HICLOVER TS300(PLC)  Burn Rate (Average) 300 kg/hour Feed Capacity(Average) 400kg/feeding Control Mode PLC Automatic Primary Combustion Chamber 2000Liters(2.0m3) Internal …

the waste incinerator for covid19 ppe waste

we produce incinerator for the waste incinerator for covid19 ppe waste, small capacity is 5-10kgs per hour powered by diesel oil.   high temeprature combustion chamber and …
treatment of clinical waste using the incinerator

treatment of clinical waste using the incinerator

All  incinerators shall meet the following emission and operating standards: • Combustion efficiency (C.E.) shall be at least 99.0% • The combustion efficiency shall be computed as follows: o C.E = (CO2 X 100) / (%CO2 +%CO) Suitably designed pollution control devices such as scrubbers, filters or electrostatic precipitators,  shall be installed/retrofitted with the incinerator to achieve emission limits.” “Each unit shall include a complete vertical exhaust and stack system, including the following features: • Steel construction. • Refractory lining in the lower section. • The exit height of the stack shall be not less than a range of 3-12 metres above ground level depending  on the capacity of the incinerator unit.  • The diameter of the stack shall be selected by the Contractor to deliver an exhaust exit velocity of not  less than 10 metres per second vertically upwards when at full scale operation. • An emission stack sampling port shall be included immediately above the secondary chamber.

biohazard waste disposal guidelines | HICLOVER.COM

biohazard waste disposal guidelines 1. The ground should be flat when install the incinerator. There should be 100cm at least between the incinerator  and the walls on the two sides and the back, which is in convenient maintenance and repair. 2.  A), Place the incinerator main body(combustion chamber) and fixed with bolts and Asbestos tape. B), Place the wet scrubber system and fixed with bolts and Asbestos tape. C). Install chimneys and fixed with bolts, Asbestos tape and Steel Rope. D). Fix the incineration house roof. E). Fix burner, blower, wind tube, electric system, fuel system. 3. Check the electric wire: the incinerator’s electric circuit should be linked with the ground wire to guard against current leakage.  The link-up of the electric wire should be checked carefully before starting the incinerator, in case of wrong link-up or leakage. 4. Check of the fuel supply system: Except the Burner’s soft pipe which is used for the fuel flowing-in and flowing-back, all the rest pipes must use brass or steel pipe. No leakage is allowed at pipe junctions. Any leakage should be blocked in time. 5. Install steel rope with the chimney, to avoid tilt by wind.  6. Install net cover at the blower, to avoid sundries. 7. If the fuel is Natural Gas with gas burner, please contact with local administration section and install gas supplier system. 8. Crane or forklift is necessary when download/upload/install incinerator.  9. Topped work house roof after installation. 10.Get the video material: http://www.eclover.net/category/incinerator-video/