refractory lining of incinerators

Must Required the Composition of the refractory lining: – Refractory bricks : . Thickness : 110 mm. Maximum temperature : 1,400 °C. Nature : 42% of Al203 – Insulator : . Thickness : 50 mm. Maximum temperature : 1,000 °C. Nature : Calcium silicate Combustion burner : * The combustion chamber should be composed of one hearth of combustion. * The combustion hearth should be fitted with one burner enabling to assure a correct combustion temperature for the complete destruction of the waste. * Burner should be  mono-bloc casing type with horizontal flame, ignition and electronic ignition safety, permanent ventilation, control electrovalve and insulation valve. Air Supply Fan: * Electro-ventilator distributes the primary and secondary air in the incinerator. * This combustion hearth should be equipped with primary air nozzles (8 nozzles) to assure the perfect combustion.  * The air injection should be done with a high pressure of 220 mm H20. * The pressure allows to pierce the burning waste bulk and to avoid the unburned ratio. * The adjustment of air rates should carried out through valves and servomotor according to the automatic cycle controls.

refractory lining of incinerators

Must Required the Composition of the refractory lining: – Refractory bricks : . Thickness : 110 mm. Maximum temperature : 1,400 °C. Nature : 42% of Al203 – Insulator : . Thickness : 50 mm. Maximum temperature : 1,000 °C. Nature : Calcium silicate Combustion burner : * The combustion chamber should be composed of one hearth of combustion. * The combustion hearth should be fitted with one burner enabling to assure a correct combustion temperature for the complete destruction of the waste. * Burner should be  mono-bloc casing type with horizontal flame, ignition and electronic ignition safety, permanent ventilation, control electrovalve and insulation valve. Air Supply Fan: * Electro-ventilator distributes the primary and secondary air in the incinerator. * This combustion hearth should be equipped with primary air nozzles (8 nozzles) to assure the perfect combustion.  * The air injection should be done with a high pressure of 220 mm H20. * The pressure allows to pierce the burning waste bulk and to avoid the unburned ratio. * The adjustment of air rates should carried out through valves and servomotor according to the automatic cycle controls.

Containerized Mobile Incinerators

○ Containerized Mobile Incinerator(CA Model) HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of …

Containerized Mobile Incinerators

○ Containerized Mobile Incinerator(CA Model) HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of …

Containerized Mobile Incinerators

○ Containerized Mobile Incinerator(CA Model) HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of …

diesel service tank (Capacity 400 litres) including level indicator

To provide for diesel service tank (Capacity 400 litres) including level indicatorThe tank should be connected to the incinerator at a higher level to enable free-flow of diesel from the tank to the incinerator. The connecting pipe must be a black pipe of approved gauge and diameter. Include other accompanying accessories and fittingsInstallation & commissioning worksPositioning of Incinerator: – Provide lifting gears as forklift, gantry, rollers, and lifting jacks and position incinerator.Connect burners to fuel supply. Chimney Installation:Composition of the chimney: –Provide a chimney with scrubber (for filtration)Provide lifting gear to hoist, erect and mount chimney, and provide supports slings as necessary. Allow for cutting of tree branches to facilitate the exercise.The chimney shall be painted with approved heat resistant paint after installation. Hospital Incinerator to Nema standards The following are the incinerator specifications :-       Waste type:      Mixed type 0,1,2,3 & 4  hospital/clinical bio hazard waste      Waste density:   125 to 350Kg/M³      Waste CV:        4000 KCAL/Kg      Moisture content:   10-25%      Estimated ash residue: 5-10%      Nominal capacity:   100Kg/hour batch load      Secondary chamber:  2 second @ 1100ºC      Environmental:    NEMA ACT           (EMCA) 1999              Clean Air Act 1999BS3316 1987Equipment The Incinerator must comprise of: –      Manual Loading door (heavy duty steel door with appropriate refractory lining)      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long      Full sized bulk load/ash removal door      1 off diesel-fired ignition burner – temperature controlled      1 off combustion air supply fan and distribution system, automatic control      High capacity secondary combustion chamber 2 second @ 1100ºC with      1 off diesel-fired afterburner – temperature controlled      Control Panel – automatic operation      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator

diesel service tank (Capacity 400 litres) including level indicator

To provide for diesel service tank (Capacity 400 litres) including level indicatorThe tank should be connected to the incinerator at a higher level to enable free-flow of diesel from the tank to the incinerator. The connecting pipe must be a black pipe of approved gauge and diameter. Include other accompanying accessories and fittingsInstallation & commissioning worksPositioning of Incinerator: – Provide lifting gears as forklift, gantry, rollers, and lifting jacks and position incinerator.Connect burners to fuel supply. Chimney Installation:Composition of the chimney: –Provide a chimney with scrubber (for filtration)Provide lifting gear to hoist, erect and mount chimney, and provide supports slings as necessary. Allow for cutting of tree branches to facilitate the exercise.The chimney shall be painted with approved heat resistant paint after installation. Hospital Incinerator to Nema standards The following are the incinerator specifications :-       Waste type:      Mixed type 0,1,2,3 & 4  hospital/clinical bio hazard waste      Waste density:   125 to 350Kg/M³      Waste CV:        4000 KCAL/Kg      Moisture content:   10-25%      Estimated ash residue: 5-10%      Nominal capacity:   100Kg/hour batch load      Secondary chamber:  2 second @ 1100ºC      Environmental:    NEMA ACT           (EMCA) 1999              Clean Air Act 1999BS3316 1987Equipment The Incinerator must comprise of: –      Manual Loading door (heavy duty steel door with appropriate refractory lining)      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long      Full sized bulk load/ash removal door      1 off diesel-fired ignition burner – temperature controlled      1 off combustion air supply fan and distribution system, automatic control      High capacity secondary combustion chamber 2 second @ 1100ºC with      1 off diesel-fired afterburner – temperature controlled      Control Panel – automatic operation      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator

diesel service tank (Capacity 400 litres) including level indicator

To provide for diesel service tank (Capacity 400 litres) including level indicatorThe tank should be connected to the incinerator at a higher level to enable free-flow of diesel from the tank to the incinerator. The connecting pipe must be a black pipe of approved gauge and diameter. Include other accompanying accessories and fittingsInstallation & commissioning worksPositioning of Incinerator: – Provide lifting gears as forklift, gantry, rollers, and lifting jacks and position incinerator.Connect burners to fuel supply. Chimney Installation:Composition of the chimney: –Provide a chimney with scrubber (for filtration)Provide lifting gear to hoist, erect and mount chimney, and provide supports slings as necessary. Allow for cutting of tree branches to facilitate the exercise.The chimney shall be painted with approved heat resistant paint after installation. Hospital Incinerator to Nema standards The following are the incinerator specifications :-       Waste type:      Mixed type 0,1,2,3 & 4  hospital/clinical bio hazard waste      Waste density:   125 to 350Kg/M³      Waste CV:        4000 KCAL/Kg      Moisture content:   10-25%      Estimated ash residue: 5-10%      Nominal capacity:   100Kg/hour batch load      Secondary chamber:  2 second @ 1100ºC      Environmental:    NEMA ACT           (EMCA) 1999              Clean Air Act 1999BS3316 1987Equipment The Incinerator must comprise of: –      Manual Loading door (heavy duty steel door with appropriate refractory lining)      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long      Full sized bulk load/ash removal door      1 off diesel-fired ignition burner – temperature controlled      1 off combustion air supply fan and distribution system, automatic control      High capacity secondary combustion chamber 2 second @ 1100ºC with      1 off diesel-fired afterburner – temperature controlled      Control Panel – automatic operation      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator