biohazard waste disposal guidelines 1. The ground should be flat when install the incinerator. There should be 100cm at least between the incinerator and the walls on the two sides and the back, which is in convenient maintenance and repair. 2. A), Place the incinerator main body(combustion chamber) and fixed with bolts and Asbestos tape. B), Place the wet scrubber system and fixed with bolts and Asbestos tape. C). Install chimneys and fixed with bolts, Asbestos tape and Steel Rope. D). Fix the incineration house roof. E). Fix burner, blower, wind tube, electric system, fuel system. 3. Check the electric wire: the incinerator’s electric circuit should be linked with the ground wire to guard against current leakage. The link-up of the electric wire should be checked carefully before starting the incinerator, in case of wrong link-up or leakage. 4. Check of the fuel supply system: Except the Burner’s soft pipe which is used for the fuel flowing-in and flowing-back, all the rest pipes must use brass or steel pipe. No leakage is allowed at pipe junctions. Any leakage should be blocked in time. 5. Install steel rope with the chimney, to avoid tilt by wind. 6. Install net cover at the blower, to avoid sundries. 7. If the fuel is Natural Gas with gas burner, please contact with local administration section and install gas supplier system. 8. Crane or forklift is necessary when download/upload/install incinerator. 9. Topped work house roof after installation. 10.Get the video material: http://www.eclover.net/category/incinerator-video/