Evaluation of Vendor offer for Solid Sludge Waste Incinerator

Square Textiles Division
Evaluation of Vendor offer for Solid Sludge Waste Incinerator 
Criteria Our Requirement Vendor
Brand/Manufacturer Nanjing Clover
Local Agent N/A
Country of Origin China
Offer Reference 2016072701N211
Technical Details
Model of Incenarator WS-100
Capacity 100 Kg/Hr
Type of Waste Used “1. Sludge of ETP
2. Waste Fabric and Yarn
3. Kitchen Waste (includes dry objects and polythene bags)
4. Paper/Carton
5. Spinning Mill AC dust/ Micro Dust”
Line Diagram PCC-SCC-Chimney-Water Tank-Spray Scrubber-Fog & Water Separator-ID System-Chimney
No of Combustion Chamber 2 2
Temperature Range at PCC 800 C 800°C-1000°C
Temperature Range at SCC 1000 C 1000°C-1200°C
Useful Life of Incinerator 10 Years
Operating Hour/Day Continuous (24 Hours) 16
Total Power Consumption (KW)
Space Requirement for the plant (L x W x H)
Primary Combusion Chamber
Chambers Construction Material  Steel
Type of Refractory Material
Refractory Lining Thickness
Conductivity of Refrectory Materials
Constituents of Refrectory Materials
Volume of Primary Comustion Chamber 1500 Ltr
Type of Insulation Material
InsulationThickness
Conductivity of Insulation Materials
Opening Door Size
Material Handling and Feeding type Semi-Automatic
Secondary Combusion Chamber
Chambers Construction Material  Steel
Type of Refractory Material
Refractory Lining Thickness
Conductivity of Refrectory Materials
Constituents of Refrectory Materials
Volume of Secondary Comustion Chamber 500 Ltr
Type of Insulation Material
InsulationThickness
Conductivity of Insulation Materials
Burner
No of Burner
Burner Model
Burner Brand & Origin
Motor’s Brand & Origin
Power Consumption of Burner Motor
Motor Efficiency Class/Insullation Class/Protection Class
Fuel Type Natural Gas & Diesel
Natural Gas Consumption 20-44 Kg/Hr
Diesel Consumption 12-41.2 M³/Hr
Oil Tank Capacity 300 Ltr
FD Fans
Number Of FD Fan
Type of FD Fan
Motor Brand & Origin for FD Fans
Motor Efficiency Class/Insullation Class/Protection Class
Construction material of Fan Body
Construction material of Fan Impeller
Power Consumption of Fan Motor
“Electrical Supply 
(Voltage, Current, Phase, Frequency)”
Fan Flowrate (m3/min)
Pressure Head (m)
ID Fans
Number Of ID Fan
Type of ID Fan
Motor Brand & Origin for ID Fans
Motor Efficiency Class/Insullation Class/Protection Class
Construction material of Fan Body
Construction material of Fan Impeller
Power Consumption of Fan Motor
“Electrical Supply 
(Voltage, Current, Phase, Frequency)”
Fan Flowrate (m3/min)
Pressure Head (m)
High Temperature Chimney
Duct Diameter
“Duct Material of Construction  
(mention grade)” Steel
Thickness of Duct
Type of Insulation Used
Insulation Thickness
Inside Lining for Duct
Water Tank
Water Tank Capacity
Matial Construction (mention grade) Steel
Wet Cooling Spray Scrubber
Nozzle Material Construction (mention grade) Steel
Dosing System
Dosing Pump Model
Dosing Pump Brand & Origin
Dosing Pump Capacity
Scrubbing Medium
Material of Construction of Venturi Scrubber
Material of Construction of Bed Scrubber
Waste Water Sink
Tank Construction Material (mention grade)
Tank Dimension (L x W x H)
PH Control System  Must be added
Dosing System
Dosing Pump Model
Dosing Pump Brand & Origin
Dosing Pump Capacity
Pump & Recirculation System
Number of Pumps
Pump Brand & Origin
Pump Flowrate (m3/min)
Pressure Head (m)
Power Consumption (KW)
Motor Efficiency Class/Insullation Class/Protection Class
Construction Material of Pump Body
Construction Material of Pump Impeller
Wet Dust Filter
Material of Construction (mention grade)
Cleaning System
Filtration System Type
Frequency of Replacement/ Maintenance
Seive Size
Mesh size of filter
Fog and Water Separator
Material of Construction (mention grade)
Chimney & Others
Main Stack/Chimney Height
Material of Construction of Chimney
Inside Lining of Chimney Duct
Control System (Alarms, Displays, Trips, Automatic Shutdown)
Alarms (please list down the alarm conditions) “1.
2.
,etc..”
Displays (please list down the displays) “1.
2.
,etc..”
Failure Conditions (please list down the failure conditions) “1.
2.
,etc..”
Trip Conditions (please list down the conditions the system will trip) “1.
2.
,etc..”
Shutdown conditions (Please list down the conditions under which the system will shutdown) “1.
2.
,etc..”
Reference Factory
Commercial Details
Delivery Time
Payment Method LC at Sight
Price Basis C& F, Chittagong
Warranty 2 Years from Comissioning
Ex-Work Price
Freight Cost
Installation & Commisioning
Total Offered Price