diesel service tank (Capacity 400 litres) including level indicator

To provide for diesel service tank (Capacity 400 litres) including level indicator
The tank should be connected to the incinerator at a higher level to enable free-flow of diesel from the tank to the incinerator. The 
connecting pipe must be a black pipe of approved gauge and diameter. Include other accompanying accessories and fittings
Installation & commissioning works
Positioning of Incinerator: –
 Provide lifting gears as forklift, gantry, rollers, and lifting jacks and position incinerator.
Connect burners to fuel supply.

Chimney Installation:
Composition of the chimney: –
Provide a chimney with scrubber (for filtration)
Provide lifting gear to hoist, erect and mount chimney, and provide supports slings as necessary. Allow for cutting of tree branches to 
facilitate the exercise.
The chimney shall be painted with approved heat resistant paint after installation.
Hospital Incinerator to Nema standards 
The following are the incinerator specifications :-

      Waste type:      Mixed type 0,1,2,3 & 4  hospital/clinical bio hazard waste
      Waste density:   125 to 350Kg/M³
      Waste CV:        4000 KCAL/Kg
      Moisture content:   10-25%
      Estimated ash residue: 5-10%
      Nominal capacity:   100Kg/hour batch load
      Secondary chamber:  2 second @ 1100ºC
      Environmental:    NEMA ACT           (EMCA) 1999
              Clean Air Act 1999
BS3316 1987
Equipment 
The Incinerator must comprise of: –
      Manual Loading door (heavy duty steel door with appropriate refractory lining)
      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long
      Full sized bulk load/ash removal door
      1 off diesel-fired ignition burner – temperature controlled
      1 off combustion air supply fan and distribution system, automatic control
      High capacity secondary combustion chamber 2 second @ 1100ºC with
      1 off diesel-fired afterburner – temperature controlled
      Control Panel – automatic operation
      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super 
duty 100mm thick firebrick with 25mm thick calcium silicate insulation)
      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the 
incinerator