HICLOVER Waste Incinerator Front view

Key Features: — Full range incinerator with Economized Small Scale incinerator, Standard Small-Large Scale incinerator, General Municipal Solid Waste Incinerator, Pet and Animal Cremation, Containerized Mobile Incinerator, High Efficient Environmental Waste Incinerator. — Single combustion chamber, double combustion chambers, three combustion chambers and multi-combustion chambers waste  incinerators. — System solutions for medical waste environmental. — High burn rate, from 5kgs to 1000kgs per hour.— New Design for pet animal cremation business. —  HICLOVER, trusted partner with years of experience. Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC) Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour Feed Capacity(Average) 20kg 40kg 60kg 100kg 200 kg Control Mode PLC PLC PLC PLC PLC …

SPECIFICATIONS OF A DIESEL FIRED INCINERATOR

The incinerator should be a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner. It should employ a temperature based logic control system to provide optimum control of the operating conditions and incorporate a high capacity thermal oxidizing secondary chamber. It should be designed to retain the exhaust gases, for at least 2 seconds to ensure the unit’s effective destruction of the combustion products.The primary combustion chamber is the main structure of the incinerator, fabricated from mild steel plate and stiffened with rolled steel sections. It is carried from the floor level on a substantial steel support frame. Internally the shell is lined with calcium silicate insulation and a hot face combination of super duty brickwork or high strength castable.The primary combustion chamber must ensure minimum exit temperature is not less than 850°C. One Manual Load Incinerator comprising:・         Manual Loading door・         Horizontal solid hearth, refractory lined primary combustion chamber. Approximate dimensions 800 mm diameters x 2100mm long・         Full sized bulk load/ash removal door・         1 off diesel-fired ignition burner ― temperature controlled・         1 off combustion air supply fan and distribution system, automatic control・         High capacity secondary combustion chamber with residence time not less than 2 seconds @ >850°C・         1 off diesel-fired afterburner ― temperature controlled・         Control panel ― automatic operatione      Temperature indication primary and secondary chambers 0-1200°C e      Refractory lined flanged chimney to a height of 10M above ground levelNote: The secondary combustion chamber must ensure that the gas temperature as measured against the inside wall in the secondary chamber & not in the flame zone, is not less than 1100°C.2.2  Throughput50kg/hour at a nominal calorific value of 4,000 kcal/kg and an average bulk density of I20kg/ M3 for general waste and l60kg/ M3 for health care waste.2.3 AshThe waste will be reduced by 90~95% to leave 10 -5% ash2.4 Quality/Environmental StandardsNEMA ACT (EMCA) 1999 BS33162.5 Operating PeriodAnticipated daily operating period 8 hoursMaximum operating period 12 hours2.6 ChamberShould be refractory lined to the following standard; Hearth and lower section of chamber walls2.7 Hot face material Super duty firebrickLimiting continuous service limit 1500°CThickness 100mmThermal conductivity 1.3 W/mk2.8 InsulationCalcium silicateLimiting continuous service limit 1000°CThickness 25mmThermal conductivity 0.095 W/mk2.9  Chimney / StackShould be manufactured from refractory lined mild steel or high quality air-cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level. 2.10  Ignition BurnersFully packaged oil type, complete with electric ignition and flame failure controls, wired with continuous running fan and complete with all valves, fan and motor.・         Maximum rating:            at least 450kW/hour・         Burner:                            arranged for on/off operation・         Maximum consumption: at least 6 litres/hour・         Average consumption:    at least 3 litres/hour2.11 AfterburnerFully packaged oil type, complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor.Maximum rating: at least 450kW/hourBurner: arranged for on/off operationMaximum consumption: at least 9 litres/hourAverage consumption: at least 4.5 litres/hour2.12 Flue gas treatmentShould have particulate remover (scrubbers) 2.13  Electrical SupplySingle phase 220/240 V a.c., 50/60 Hz.3 Documentation:Operation manual 2 setsService/maintenance manual 2 sets4 CertificationNEMA (or other recognized) certification5 Capacity to service equipmentThe agent/supplier shall have adequate facilities, spare parts, consumables and qualified and skilled technical staff.6 TrainingThe agent shall conduct a two days  incinerators training after installation & commissioning of the equipment.The agent shall conduct a two days operation & maintenance training to the Biomedical engineering personnel after installation & commissioning of the equipment.

House of the incinerator

* Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging     flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice      gate of regulation and isolating valve. *  Plate of combustion in Carborundum, avoiding the fixing of …

refractory lining of incinerators

Must Required the Composition of the refractory lining: – Refractory bricks : . Thickness : 110 mm. Maximum temperature : 1,400 °C. Nature : 42% of Al203 – Insulator : . Thickness : 50 mm. Maximum temperature : 1,000 °C. Nature : Calcium silicate Combustion burner : * The combustion chamber should be composed of one hearth of combustion. * The combustion hearth should be fitted with one burner enabling to assure a correct combustion temperature for the complete destruction of the waste. * Burner should be  mono-bloc casing type with horizontal flame, ignition and electronic ignition safety, permanent ventilation, control electrovalve and insulation valve. Air Supply Fan: * Electro-ventilator distributes the primary and secondary air in the incinerator. * This combustion hearth should be equipped with primary air nozzles (8 nozzles) to assure the perfect combustion.  * The air injection should be done with a high pressure of 220 mm H20. * The pressure allows to pierce the burning waste bulk and to avoid the unburned ratio. * The adjustment of air rates should carried out through valves and servomotor according to the automatic cycle controls.

refractory lining of incinerators

Must Required the Composition of the refractory lining: – Refractory bricks : . Thickness : 110 mm. Maximum temperature : 1,400 °C. Nature : 42% of Al203 – Insulator : . Thickness : 50 mm. Maximum temperature : 1,000 °C. Nature : Calcium silicate Combustion burner : * The combustion chamber should be composed of one hearth of combustion. * The combustion hearth should be fitted with one burner enabling to assure a correct combustion temperature for the complete destruction of the waste. * Burner should be  mono-bloc casing type with horizontal flame, ignition and electronic ignition safety, permanent ventilation, control electrovalve and insulation valve. Air Supply Fan: * Electro-ventilator distributes the primary and secondary air in the incinerator. * This combustion hearth should be equipped with primary air nozzles (8 nozzles) to assure the perfect combustion.  * The air injection should be done with a high pressure of 220 mm H20. * The pressure allows to pierce the burning waste bulk and to avoid the unburned ratio. * The adjustment of air rates should carried out through valves and servomotor according to the automatic cycle controls.

Containerized Mobile Incinerators

○ Containerized Mobile Incinerator(CA Model) HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed. Containerization is the …

Containerized Mobile Incinerators

○ Containerized Mobile Incinerator(CA Model) HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed. Containerization is the …

diesel service tank (Capacity 400 litres) including level indicator

To provide for diesel service tank (Capacity 400 litres) including level indicatorThe tank should be connected to the incinerator at a higher level to enable free-flow of diesel from the tank to the incinerator. The connecting pipe must be a black pipe of approved gauge and diameter. Include other accompanying accessories and fittingsInstallation & commissioning worksPositioning of Incinerator: – Provide lifting gears as forklift, gantry, rollers, and lifting jacks and position incinerator.Connect burners to fuel supply. Chimney Installation:Composition of the chimney: –Provide a chimney with scrubber (for filtration)Provide lifting gear to hoist, erect and mount chimney, and provide supports slings as necessary. Allow for cutting of tree branches to facilitate the exercise.The chimney shall be painted with approved heat resistant paint after installation. Hospital Incinerator to Nema standards The following are the incinerator specifications :-       Waste type:      Mixed type 0,1,2,3 & 4  hospital/clinical bio hazard waste      Waste density:   125 to 350Kg/M³      Waste CV:        4000 KCAL/Kg      Moisture content:   10-25%      Estimated ash residue: 5-10%      Nominal capacity:   100Kg/hour batch load      Secondary chamber:  2 second @ 1100ºC      Environmental:    NEMA ACT           (EMCA) 1999              Clean Air Act 1999BS3316 1987Equipment The Incinerator must comprise of: –      Manual Loading door (heavy duty steel door with appropriate refractory lining)      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long      Full sized bulk load/ash removal door      1 off diesel-fired ignition burner – temperature controlled      1 off combustion air supply fan and distribution system, automatic control      High capacity secondary combustion chamber 2 second @ 1100ºC with      1 off diesel-fired afterburner – temperature controlled      Control Panel – automatic operation      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator