incineration combustion chamber

1/ Thecost of one YD-20C incinerator. 2/ Incinerator consist of 2 chamber to significant reduction in emission, temperature range of 800C …

Large incinerators – INDUSTRIAL INCINERATORS

Large  incinerators – INDUSTRIAL  INCINERATORS  2.) Size requirement for the  incinerators is 750 — 850 kg capacity 3.) The bum rate should be 80 LL 100 kg/ hour. 4) The primary chamber shouId have an operating temperature of 900 -1200 degree C. 5) The incinerator should hate a high temperature secondary chamber and 2 second gas retention time at 850- 1150 degree C so that it is suitable for high risk materials. 6). The incinerator should have temperature monitoring and thermostat control for ease of operation and assurance of bum temperature to confirm correct operation. 7). The incinerator should be capable of burning any of the hazardous wastes listed in the subsequent section. 8) The incinerator should be capable of burning diesel oil and should include a larger fuel tank (10-500 litres) and generator (3 –40 kV) set that can be carried on the trailer with the incinerator so that the unit requires no external electrical power supply. 9.) The incinerator should be trailer mounted so that it is a po Hazardous Waste to be Incinerated Hazardous solid chemical: Different types of combustible solids, used textiles, grease, and toner cartridges, chemicals for water purification and photographic consumables and plastic material, empty …

Technical specification for burning machine

Technical specification for burning machine 1.Two systems are required to be installed in the south of the Kingdom of Saudi Arabia. The two systems will be used by custom authority to  burn different kinds of drugs. All need equipment must be provided. 2.Warrantee:  booth systems must be provided with 3 years warrantee from the date of acceptance. All needed spare parts, preventative  maintenance repair and corrective maintenance must be included in the cost and provided to the customer. 3.All needed electric and water connections must be provided. 4.Both systems must be of high quality and must be environmental friendly. 5.The capacity of each system should be up to 100 kg/hr. 6.The system must have automatic feeding. 7.Each system must consists of two burning  rooms, one primary room for burning the drug and another room for burning the gases  that emit as  a result of primary burning.  8.The oven must be made of steel that is rust resistance and with thickness not less than 6 mm. 9.Each system must be of high efficient in burning different kinds of drugs, and should have 99.9% efficiency for burning organic materials. 10.Waste products should not exceed 5%. 11.System must have automatic ignition system.  12.System should use diesel (HSD) as fuel and should not consume more than  8 to 10 lt/hr .  13.Each system should be provided with fuel tank  of size adequate to operate the system for one full day. 14.The temperature in the primary room should be 850 C ± 50 C. the system should also be capable to operate up to 1050 C ± 50 C. the system  should be capable of continues operation and should be provided with cement layer insulator with adequate thickness. 15.Oven should be provided with heat insulator to allow easy operation. 16.Gas should remain in the secondary room for not more than 1.5 second. 

Incinerator Technical Specifications

Incinerator Technical Specifications Parameter Description Property CHIMNEY – Standard top type – Self supporting PERFORMANCE Temperature Not less than 11000C Capacity (kg/hr.) 10 Waste type  paper, clothing, packaging, rags, pallets, polythene and others Air pollution Standard The Environment Conservation Rules, 1997 DIMENSIONS Height(mm) 2256 Length (mm) 725 …

SPECIFICATIONS OF THE MEDICAL BIOLOGICAL WASTE INCINERATOR

SPECIFICATIONS OF THE MEDICAL/BIOLOGICAL WASTE  INCINERATOR It should  be  a three chambered incinerator  The load capacity of 250 kg The housing for the incinerator should be able to withstand the temperatures and other operational requirements. The chimney should have a strong refractory lining of special type of cement to withstand temperatures more than 1200oc. It should have a strong base for the machine to keep it stable, firm and secure during its operational lifespan. The primary (combustion) and the secondary (scorching) chambers to be fitted with burners for effective combustion. In the third chamber, scrubbers and precipitators will need to be installed as pollution control equipment before emission of gases into the atmosphere. A system for continuous emission Monitoring and Environmental Monitoring. A mechanism with which to treat the waste water before discharge into the sewerage system. Temperature control and monitoring devices (probe thermometer) should be availed to ensure that the right temperatures are attained in the chambers during operation. Motor (fans) sufficient to induce enough air into the combustion chambers and direct the gases towards the flue 9 chimney). High power electricity and emergency generator connection for automated ignition purposes. The chimney should be tall enough and be at least one meter above the tallest building in the vicinity. The fuel tank (industrial diesel) to be constructed next to but out side the incinerator housing for security purposes and to prevent fire hazards. Capacity of 250. Other Requirements Training of all the personnel involved in health care waste (HCW) management. The Automatic Feeding system of the Incinerator Automatic waste loading mechanism with conveyor belts. These will lead the waste into the first primary chamber. An Automatic bottom ashes discharge system.

MEDICAL/BIOLOGICAL WASTE INCINERATOR

SPECIFICATIONS OF THE MEDICAL/BIOLOGICAL WASTE  INCINERATOR It should  be  a three chambered incinerator  The load capacity of 250 kg The housing for the incinerator should be able to withstand the temperatures and other operational requirements. The chimney should have a strong refractory lining of special type of cement to withstand temperatures more than 1200oc. It should have a strong base for the machine to keep it stable, firm and secure during its operational lifespan. The primary (combustion) and the secondary (scorching) chambers to be fitted with burners for effective combustion. In the third chamber, scrubbers and precipitators will need to be installed as pollution control equipment before emission of gases into the  atmosphere. A system for continuous emission Monitoring and Environmental Monitoring. A mechanism with which to treat the waste water before discharge into the sewerage system. Temperature control and monitoring devices (probe thermometer) should be availed to ensure that the right temperatures are attained in the  chambers during operation. Motor (fans) sufficient to induce enough air into the combustion chambers and direct the gases towards the flue 9 chimney). High power electricity and emergency generator connection for automated ignition purposes. The chimney should be tall enough and be at least one meter above the tallest building in the vicinity. The fuel tank (industrial diesel) to be constructed next to but out side the incinerator housing for security purposes and to prevent fire  hazards. Capacity of 250. Other Requirements Training of all the personnel involved in health care waste (HCW) management. The Automatic Feeding system of the Incinerator …

Incinerator walls and roof

21.Refractory material :alumina content> 49% and thickness average 102mm 22.Bake out : to be done over 2-3 days 23.Materials of constructions Case :5mm mild steel Bracing: heavy angle and channel Hearth: 1550 ⁰C Ashing door: high grade cast iron Loading door 5mm mild steel lined with 1550 ⁰C castable general purpose high strength, high abrasion resistant monolithic refractory  concrete. Incinerator walls and roof: 1550 ⁰C castable monolithic refractory 24.Temperature: ≥ 90 ⁰C 25.Insulation to walls: 1000 ⁰C castable insulation 26.Electricity supply required: 220volt, 15amp single phase 27.Controls: Draught control: barometer indicator, door operated draught limiter Air supply: built-in forced heated air ducts, primary and secondary (intensifier) Electric: control panel includes-circuit breakers, main switch, timer, pilot lights, 2 set point pyrometer and one set point pyrometer Summary of Key Expected Activities/Outputs Replacement of pipes from the tank to the incinerator Covering pipes to protect them bursting in winter Replacement of gauge …

a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner

The incinerator should be a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner. It  should employ a temperature based logic control system to provide optimum control of the operating conditions and incorporate a high capacity  thermal oxidizing secondary chamber. It should be designed to retain the exhaust gases, for at least 2 seconds to ensure the unit’s effective  destruction of the combustion products.   i. Waste type Health care waste   ii. Waste density 125 to 350Kg/M3   iii.. Waste Calorific Value 4000 KCAL/Kg   iv. Moisture content 10-25%   …